DSpace Repository

THE ACYCLIC DIRECTED NON - STOCHASTIC NETWORK ( SCHEDULING AND RESOURCE LEVELLING)

Show simple item record

dc.contributor.author Vishwanath, G.
dc.date.accessioned 2014-11-14T10:22:01Z
dc.date.available 2014-11-14T10:22:01Z
dc.date.issued 1975
dc.identifier M.Tech en_US
dc.identifier.uri http://hdl.handle.net/123456789/8530
dc.guide Puri, N.
dc.description.abstract The relevance of a systems approach to construction management is pointed out. Network techniques* as a tool in systems analysis, have been mentioned and the acyclic, directed, non stochastic network (the CPM network) has been discussed in detaile The mathematical model of the scheduling phase of CPM has been presented and followed by a lucid.descrip Lion of a computer program for the scheduling computations. The importance of the problem of Res ource bevelling has been discussed and followed by a survey of the work. already done in this field. An original algorithm for the Resource scheduling problem has been presented, followed by a detailed description of the computer program. To illustrate the two computer programs, the hutment renovation project currently in progress at the University, has been taken as a case study, and the results of the CPM Scheduling program and the Resource levelling program have been reported. en_US
dc.language.iso en en_US
dc.subject CIVIL ENGINEERING en_US
dc.subject ACYCLIC DIRECTED NON - STOCHASTIC NETWORK en_US
dc.subject SCHEDULING AND RESOURCE LEVELLING en_US
dc.subject CPM NETWORK en_US
dc.title THE ACYCLIC DIRECTED NON - STOCHASTIC NETWORK ( SCHEDULING AND RESOURCE LEVELLING) en_US
dc.type M.Tech Dessertation en_US
dc.accession.number 108418 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record