DSpace Repository

RIVER DIVERSION • •PLANNING FOR DAM CONSTRUCTION. WITH SPECIAL REFERENCE TO TEHRI DAM

Show simple item record

dc.contributor.author Basha, Mohd. Khadar
dc.date.accessioned 2014-10-08T10:52:50Z
dc.date.available 2014-10-08T10:52:50Z
dc.date.issued 2003
dc.identifier M.Tech en_US
dc.identifier.uri http://hdl.handle.net/123456789/5105
dc.guide Asthana, B. N.
dc.guide Singh, Raj Pal
dc.description.abstract The design for a dam, which is to be constructed across a stream channel must consider diversion of the stream flow around or through the dam site during the construction period. In the case of important schemes the river will usually have a permanent flow and 'it will thus be necessary to temporarily dry out the zone where the works are to be carried out. The extent of the diversion problem will vary with the size and, flood potential of the river. A diversion problem exists to some extent at all sites except those located off stream. The diversion scheme ranks in importance with other project features and is often a major cost item and therefore, requires intelligent planning en_US
dc.language.iso en en_US
dc.subject WATER RESOURCES DEVELOPMENT AND MANAGEMENT en_US
dc.subject RIVER DIVERSION PLANNING en_US
dc.subject DAM CONSTRUCTION en_US
dc.subject TEHRI DAM en_US
dc.title RIVER DIVERSION • •PLANNING FOR DAM CONSTRUCTION. WITH SPECIAL REFERENCE TO TEHRI DAM en_US
dc.type M.Tech Dessertation en_US
dc.accession.number G11407 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record