DSpace Repository

MODELLING OF A RIVER SYSTEM USING MIKE-11

Show simple item record

dc.contributor.author Parvaze, Sabah
dc.date.accessioned 2019-05-16T11:56:02Z
dc.date.available 2019-05-16T11:56:02Z
dc.date.issued 2016-05
dc.identifier.uri http://hdl.handle.net/123456789/14199
dc.description.abstract An integrated MIKE 11 NAM and HD model has been developed to simulate the rainfall-runoff process in the Ram Munshi Bagh Sub-basin of Jhelum Basin. The model was calibrated using daily rainfall, evaporation, temperature and discharge data of the period 1985 to 2005. The model was then validated by calculating the daily discharge values for next 10 years. The coefficients of determination for the model calibration and validation were 0.749 and 0.792 respectively, indicating good agreement between the observed and simulated runoff. The performance of the model was evaluated on the basis of Nash–Sutcliffe Efficiency Index (EI) and Index of Agreement (d). The EI and d values obtained were 0.75 and 0.93 respectively for calibration period while the values of EI and d for validation period were 0.79 and 0.94 respectively. Sensitivity analysis showed that Coefficient of Overland flow (CQOF) was the most sensitive parameter affecting model efficiency as well as peak and low flows significantly. The calibrated model was also used to simulate extreme flood events occurred in the study basin. History of Kashmir is full of the tragic accounts of floods, which mostly occur due to insufficient carrying capacity of its only drainage channel i.e. Jhelum. The simulated extreme flood events showed a difference of 3-17% in their peaks for different flood events. For the 2014 flood event the simulated discharge was 2055 m3/s which was only 3.2% more than the observed discharge indicating suitability of present model setup for simulating rainfall runoff process in the Jhelum basin including simulation of extreme flood events. en_US
dc.description.sponsorship INDIAN INSTITUTE OF TECHNOLOGY ROORKEE ROORKEE. en_US
dc.language.iso en en_US
dc.publisher HYDROLOGY IITR en_US
dc.subject MIKE 11 NAM en_US
dc.subject rainfall-runoff process en_US
dc.subject Coefficient of Overland flow (CQOF) en_US
dc.subject Nash–Sutcliffe Efficiency Index (EI) en_US
dc.subject Efficiency Index en_US
dc.subject Index of Agreement en_US
dc.title MODELLING OF A RIVER SYSTEM USING MIKE-11 en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record