Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/5293
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMartono, Hery-
dc.date.accessioned2014-10-09T05:30:46Z-
dc.date.available2014-10-09T05:30:46Z-
dc.date.issued2007-
dc.identifierM.Techen_US
dc.identifier.urihttp://hdl.handle.net/123456789/5293-
dc.guideChauhan, Gopal-
dc.guideKumar, Dinesh-
dc.description.abstractPresent day Construction projects are capital intensive where deployment of large and heavy equipments & machinery so as to ensure earlier accrual of benefits, is ubiquitous. High mechanization entails heavy initial investment on the construction equipment which may be as high as 25 to 30 percent of the cost of the project. However, in the long run, if the equipment is operated, maintained and managed efficiently, then the investment will pay more than what it costs Therefore, it is important to maintain the equipment because idle equipment due to lack of maintenance not only can add to losses, but also the equipment is likely to be rendered unserviceable due to lying unused. Their periodic maintenance, brings the equipments near to its original condition. Hence maintenance of these equipments is of vital importance to ensure that these are in the perfect condition for use on the works. The Objective of this study is to identify procedures, by which the maintenance of equipment can be carried out efficiently and effectively in order to achieve maximum economical production from the equipment, with minimum breakdowns. Hence, the procedures and models in maintenance of equipment are discussed for achieving the overall economy of maintenance. The essential requirements for an efficient maintenance programme like scheduled maintenance, inspections and repair or overhaul with minimum waiting are also covered. This topic includes discussion of some of system models for maintenance to achieve the objective of efficient maintenance programme. The application of waiting line model, sequencing model, assignment model, replacement model are of great use in achieving the maximum profit and ,least downtime of equipment and their use has been illustrated.en_US
dc.language.isoenen_US
dc.subjectWATER RESOURCES DEVELOPMENT AND MANAGEMENTen_US
dc.subjectMAINTENANCE STRATEGYen_US
dc.subjectCONSTRUCTION EQUIPMENTSen_US
dc.subjectECONOMICAL PRODUCTIONen_US
dc.titleTO SELECT BEST MAINTENANCE STRATEGY FOR THE CONSTRUCTION EQUIPMENTSen_US
dc.typeM.Tech Dessertationen_US
dc.accession.numberG13184en_US
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDMG13184.pdf4.39 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.