Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/5225
Title: PLANNING AND LAYOUT OF A RUN-OF RIVER HYDROPOWER SCHEME WITH PONDAGE - A CASE STUDY
Authors: Maurya, Atul Kumar
Keywords: WATER RESOURCES DEVELOPMENT AND MANAGEMENT;RUN-OF RIVER HYDROPOWER SCHEME;PONDAGE;HYDRO POWER
Issue Date: 2006
Abstract: The estimated hydro power potential in India is about 84000 MW at 60 % load factor, out of which only 32326 MW has so far been harnessed. Its share in total energy generation is about 25.9 % whereas for efficient power system it shall be 40 % as per CEA norms. At present time the peak power shortage is of the order of 12.5 %, so for improvement of present power situation it is required to harness more and more hydropower potential of our country. Hydro power generation can be possible either by storage schemes or by run-of-river schemes. There are lot of problems which are associated with storage schemes, hence run-of-river schemes are more appealing and out of 845 total identified hydro electric sites 514 are run-of-river schemes. This study deals with planning and layout of run-of-river schemes with pondage with a case study of Luhri hydro electric project. The study gives the basic idea about planning of a run-of-river hydropower scheme, the data, the information, and the investigation required to develop a scheme to harness the potential of stream. Besides this, study deals with the layout of different component of project. There is no unique solution to the problems of any project, the solution are generally site specific....
URI: http://hdl.handle.net/123456789/5225
Other Identifiers: M.Tech
Research Supervisor/ Guide: Chauhan, Gopal
Asthana, B. N.
metadata.dc.type: M.Tech Dessertation
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDMG12929.pdf9 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.