Title: A CRITICAL STUDY Of CONSTRUCTION MANAGEMENT WITH FOCUS ON TIME AND COST OVERRUN - A CASE STUDY OF PRAGANNA KULO IRRIGATION SYSTEM - NEPAL
Authors: Regmi, Binaya
Keywords: WATER RESOURCES DEVELOPMENT AND MANAGEMENT;CONSTRUCTION MANAGEMENT;PRAGANNA KULO IRRIGATION SYSTEM;IRRIGATION MANAGEMENT
Issue Date: 1999
Abstract: Implementation of a water resource project, consisting, of different engineering infrastructure, with different foundation condition in view of the large variation in the soil characteristics where ever the project is to be implemented, with proper management to control time and cost over-run is a challenge to civil engineers. First half of the 20th century a large number of projects have been planned, designed and constructed mostly maintaining the construction schedule and cost in general. In the present day context, although there is tremendous development in technology, in resources, construction activities with speedy development of construction equipment material and also large construction companies with specialization; the effective Resources mobilization in construction project in developing countries could. not control the unexpected cost and time overrun......
URI: http://hdl.handle.net/123456789/4916
Other Identifiers: M.Tech
Research Supervisor/ Guide: Singh, Rajpal
metadata.dc.type: M.Tech Dessertation
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDM248447.pdf6.98 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.