Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/4913
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDas, Mrinalni-
dc.date.accessioned2014-10-08T06:33:29Z-
dc.date.available2014-10-08T06:33:29Z-
dc.date.issued2000-
dc.identifierM.Techen_US
dc.identifier.urihttp://hdl.handle.net/123456789/4913-
dc.guidePadhy, N. P.-
dc.guideDas, Devadutta-
dc.description.abstractIn the proposed project the costs associated with an electrical energy supply interruption for industrial loads are estimated using interruption data obtained from different industries surveyed. The ex-pected energy not supplied for generation outage is also evaluated using frequency and duration technique. A fuzzy load model has been used for the interruption cost calculation to eliminate the error involved in the forcasted loads. The results obtained from - the proposed model is quite encouraging and may . help the industries to operate efficiently and it may also help the utility engineers for future planning •and decision making.en_US
dc.language.isoenen_US
dc.subjectWATER RESOURCES DEVELOPMENT AND MANAGEMENTen_US
dc.subjectELECTRICAL ENERGY INTERRUPTIONen_US
dc.subjectINDUSTRIAL LOADSen_US
dc.subjectFUZZY LOAD MODELen_US
dc.titleCOST ASSESSMENT OF ELECTRICAL ENERGY INTERRUPTION -A CASE STUDY FOR INDUSTRIAL LOADSen_US
dc.typeM.Tech Dessertationen_US
dc.accession.number248445en_US
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDM248445.pdf2.78 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.