Please use this identifier to cite or link to this item:
http://localhost:8081/xmlui/handle/123456789/4794
Title: | USE OF SYSTEM TECHNIQUES IN MAINTENANCE PLANNING • OF HEAVY EARTH-MOVING EQUIPMENTS |
Authors: | Ray, Amitava |
Keywords: | WATER RESOURCES DEVELOPMENT AND MANAGEMENT;HEAVY EARTH-MOVING EQUIPMENTS;MAINTENANCE PLANNING;SYSTEM TECHNIQUES |
Issue Date: | 1995 |
Abstract: | The application of heavy earth-moving equipments in WHO or other construction projects has become synonymous with productivity and achievements of scheduled work(s) with in stipulated time-frame. Therefore the consequent need for effective maintenance procedures planning cannot be over emphasised._x000D_ The system technique procedures which has been discussed In this dissertation, fo.r• giving an in-sight to the equipment Manager/Maintenance-Engineer for making a sound judgement in the field of maintenance management is a vital role to play as far as overall economy in maintenance and working life of an equipment is concerned._x000D_ The essential requirements of an effective maintenance programme lies with planned inspections and preventive or periodic maintenance procedures including effective lubrication programe . |
URI: | http://hdl.handle.net/123456789/4794 |
Other Identifiers: | M.Tech |
Research Supervisor/ Guide: | Chauhan, Gopal |
metadata.dc.type: | M.Tech Dessertation |
Appears in Collections: | MASTERS' THESES (WRDM) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WRDM247871.pdf | 8.49 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.