Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/4641
Title: GENERATION PLANNING INCLUDING PUMPED STORAGE
Authors: Pati, Sudhansu Sekhar
Keywords: WATER RESOURCES DEVELOPMENT AND MANAGEMENT;GENERATION PLANNING;PUMPED STORAGE;POWER SYSTEM
Issue Date: 1990
Abstract: In present days load shedding due to shortage of generation & limitation on transmission capabilities etc. has become a very common feature in India. But it is creating a lot of inconvenience to the consumers and is affecting the development of the country. This is due to either non-planning or bad planning of the power system. Out of the many aspects of power system planning, the generation expansion planning is the most important. Because without adequate generating capacity the demand with appropriate quality and sufficient reliability can not be met. On the other hand, if generation facilities are expanded randomly irrespective of the demand, a big and scare capital may remain as an idle investment causing shortage in other sectors. This will also cause high cost of genoraLion, thereby un- necessarily over taxing the consumers. Also the gestation period for a generation facilities is very large being in the order of 5 to 6 years......
URI: http://hdl.handle.net/123456789/4641
Other Identifiers: M.Tech
Research Supervisor/ Guide: Sharma, J. D.
metadata.dc.type: M.Tech Dessertation
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDM246178.pdf2.97 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.