Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/4606
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSamantaraya, M. M.-
dc.date.accessioned2014-10-07T07:09:12Z-
dc.date.available2014-10-07T07:09:12Z-
dc.date.issued1989-
dc.identifierM.Techen_US
dc.identifier.urihttp://hdl.handle.net/123456789/4606-
dc.guideBadarinath, H. S.-
dc.description.abstractA river diversion arrangement is essential for any major or medium dam. To facilitate the execution of Podagada Earth Dam a diversion tunnel become necessary for diverting the flow of water during the construction period. The rock is very ideal for tunnelling. As a modern practice this diversion tunnel is planned to be converted in to a depletion tunnel to serve as a permanent. outlet for the purpose of depleting the reservoir in case of distress in Podagada earth dam. This study makes a critical assessment of planning, design and construction practice of depletion tunnel. Modern means of planning and design have been adopted after due consideration..en_US
dc.language.isoenen_US
dc.subjectWATER RESOURCES DEVELOPMENT AND MANAGEMENTen_US
dc.subjectPODAGODA DIVERSIONen_US
dc.subjectDEPLETION TUNNELen_US
dc.subjectRIVER DIVERSION ARRANGEMENTen_US
dc.titleCRITICAL ASSESSMENT OF PODAGODA DIVERSION--C UM-DEPLETION TUNNELen_US
dc.typeM.Tech Dessertationen_US
dc.accession.number245193en_US
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDM245193.pdf8.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.