Please use this identifier to cite or link to this item:
http://localhost:8081/xmlui/handle/123456789/4606
Title: | CRITICAL ASSESSMENT OF PODAGODA DIVERSION--C UM-DEPLETION TUNNEL |
Authors: | Samantaraya, M. M. |
Keywords: | WATER RESOURCES DEVELOPMENT AND MANAGEMENT;PODAGODA DIVERSION;DEPLETION TUNNEL;RIVER DIVERSION ARRANGEMENT |
Issue Date: | 1989 |
Abstract: | A river diversion arrangement is essential for any major or medium dam. To facilitate the execution of Podagada Earth Dam a diversion tunnel become necessary for diverting the flow of water during the construction period. The rock is very ideal for tunnelling. As a modern practice this diversion tunnel is planned to be converted in to a depletion tunnel to serve as a permanent. outlet for the purpose of depleting the reservoir in case of distress in Podagada earth dam. This study makes a critical assessment of planning, design and construction practice of depletion tunnel. Modern means of planning and design have been adopted after due consideration.. |
URI: | http://hdl.handle.net/123456789/4606 |
Other Identifiers: | M.Tech |
Research Supervisor/ Guide: | Badarinath, H. S. |
metadata.dc.type: | M.Tech Dessertation |
Appears in Collections: | MASTERS' THESES (WRDM) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WRDM245193.pdf | 8.91 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.