Please use this identifier to cite or link to this item:
http://localhost:8081/xmlui/handle/123456789/4296
Title: | OPTIMAL CONSTRUCTION SCHEDULING OF LOWER PERIYAR HYDRO ELECTRIC PROJECT |
Authors: | Nair G., Sasidharan |
Keywords: | WATER RESOURCES DEVELOPMENT AND MANAGEMENT;OPTIMAL CONSTRUCTION SCHEDULING;LOWER PERIYAR HYDRO ELECTRIC PROJECT;HYDRO ELECTRIC |
Issue Date: | 1983 |
URI: | http://hdl.handle.net/123456789/4296 |
Other Identifiers: | M.Tech |
Research Supervisor/ Guide: | Verma, Mahesh |
metadata.dc.type: | M.Tech Dessertation |
Appears in Collections: | MASTERS' THESES (WRDM) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WRDM177475.pdf | 5.02 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.