Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/4175
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDe, Sanjib Chandra-
dc.date.accessioned2014-10-05T11:39:47Z-
dc.date.available2014-10-05T11:39:47Z-
dc.date.issued1980-
dc.identifierM.Techen_US
dc.identifier.urihttp://hdl.handle.net/123456789/4175-
dc.guideGoel, M. C.-
dc.description.abstract,It present, the general thinking in the country is that by lining the f i =ld. channels, considerable amount of water can be saved. However, the economics of lining depends upon many factors such as seepage loss, the use factor of the channel, discount rate, and the uses of water saved, by lining. . mathe-matical model for study of economics of lining length of field channel is discussed. with a case study. The study has indicated that the optimum length of lining primarily sensitive to seepage loss rate through un-lined channel, period of operation of channel and type of lining. It has been found out that earth lining has an edge over conventional brick lining because it being cheaper and thus gives an indication that while selecting kind of lining to be adopted to a particular project, all alternatives of lining should be considered.....en_US
dc.language.isoenen_US
dc.subjectWATER RESOURCES DEVELOPMENT AND MANAGEMENTen_US
dc.subjectLINING LENGTHSen_US
dc.subjectFIELD CHANNELSen_US
dc.subjectSEEPAGE LOSSen_US
dc.titleOPTIMIZATION OF LINING LENGTHS OF FIELD CHANNELSen_US
dc.typeM.Tech Dessertationen_US
dc.accession.number176263en_US
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
WRDM176263.pdf5.05 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.