Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/3502
Title: APPLICATION OF THE BOOKING SYSTEM, DELAY TIME STUDY, . WORK SAMPLING AND GROUP INCENTIVE POLICY IN A WATCH FACTORY
Authors: Chandra, Deep
Keywords: MECHANICAL & INDUSTRIAL ENGINEERING;BOOKING SYSTEM;WATCH FACTORY;GROUP INCENTIVE POLICY
Issue Date: 1990
Abstract: In this dissertation a literature review and subsequent experiments on the job Booking System, Work Sampling, Delay Time Study and Incentive Scheme have been reported. It depicts that job Booking System is the source of getting various informations for the management. Effective utilisation of machines and man power, proper utilisation of tools control on rejection and rework etc. are easily possible by this system. Selection of fair incentive scneme as very much essential for improving productivity and morale of employees. Shop wise Incentive Scheme avoids the technological differences of different -J.VYa ui. ine waticn ractory. Delay eu y and Won Sampling are the main tools of getting correct and quick bLbedback of the prcidution work.
URI: http://hdl.handle.net/123456789/3502
Other Identifiers: M.Tech
Research Supervisor/ Guide: Khanna, Ashok
Wakhlu, Vijay
metadata.dc.type: M.Tech Dessertation
Appears in Collections:MASTERS' THESES (MIED)

Files in This Item:
File Description SizeFormat 
MIED245372.pdf5.7 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.