Please use this identifier to cite or link to this item:
http://localhost:8081/jspui/handle/123456789/2902| Title: | JOB SHOP & FLOW SHOP SCHEDULING: DEVELOPMENT OF A HEURISTIC APPROACH |
| Authors: | Srinivas, V. |
| Keywords: | MECHANICAL & INDUSTRIAL ENGINEERING;JOB SHOP SCHEDULING;FLOW SHOP SCHEDULING;HEURISTIC APPROACH |
| Issue Date: | 1988 |
| Abstract: | In this work the jobshcp,Cscheduling problems have been-, reviewed in view of the existing methods, both exact and approxifaate, fur solging the scheduling problems. Two new approximate- m.thods (heuristics) have been proposed for solving the general flowshop scheduling problem. A computational study is made on the proposed methods by generating random sets of data. The eff`ctiveness of the proposed heuristics is demonstrated by comparing the solutions obtained from heuristics with the optimal solutions. \ Suggestions for further extension of the proposed heuristics........... |
| URI: | http://hdl.handle.net/123456789/2902 |
| Other Identifiers: | M.Tech |
| Research Supervisor/ Guide: | Gaindhar, J. L. |
| metadata.dc.type: | M.Tech Dessertation |
| Appears in Collections: | MASTERS' THESES (MIED) |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| MIED179718.pdf | 3.24 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
