Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/15871
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMekete, Teshome-
dc.date.accessioned2024-11-14T05:47:12Z-
dc.date.available2024-11-14T05:47:12Z-
dc.date.issued2019-05-
dc.identifier.urihttp://localhost:8081/xmlui/handle/123456789/15871-
dc.description.abstractProviding safe and adequate drinking water for the consumer has been one of the major challenges in developing country mainly in Ethiopia. There is no urban cites of Ethiopia supply 24/7 water for user including Durame town. So that the main aim of this research was to assess and discuss in detail the existing water coverage, water demand, environmental, technical related problems and institutional factors my study on first. To do this: field observation, consultation with different concerned officials and water distribution system design document was used to understand and visualize the level of water in Durame town. Furthermore, the necessary information was collected such as current population, the growth rate of the area, the elevation of point map of the city, source quantity, and water supply distribution system data are collected. The node and the link inputs of water distribution system were simulated to analyze the system by inserting input data by using EPANET 2.0 and parameters. The results of this study indicate the water supply of the Durame town cover only 52 percent of total population (i.e. more than 48% of town population used water from an unprotected source such as hand-dug well, unprotected river and other vendors). The future water demand of town will be 5533m3/day by 2035. If the city water supply (source) not expand in future the gap between demand and supply increased to 65.7% in this year. Furthermore, the output of hydraulic simulation of water distribution network shows, the pressure of node at specific area and velocity of water in the same pipe were below the permissive limit (standard) set by Ethiopia Minister of Water resource design criteria. Also, the chlorine residual in the network were below the permissive limit of 0.2mg/l at varies nodes after 52hr of extended analysis. Finally, to improve pressure and velocity in the water distribution network, it is necessary to use the appropriate boosting station and pressure controlling valve as well as an aged pipe of some line should be replaced by required size pipe. Additionally, the present water deficit of town should be minimized by digging addition wells or another source to fulfill the gaps between demand and supply.en_US
dc.description.sponsorshipINDIAN INSTITUTE OF TECHNOLOGY ROORKEEen_US
dc.language.isoenen_US
dc.publisherIIT ROORKEEen_US
dc.subjectDurame Townen_US
dc.subjectWater Supplyen_US
dc.subjectWater Demanden_US
dc.subjectDistribution Networken_US
dc.subjectEPANETen_US
dc.subjectWater Resource Designen_US
dc.titleSTUDY OF WATER SUPPLY TO DURAME TOWN IN ETHIOPIAen_US
dc.typeOtheren_US
Appears in Collections:MASTERS' THESES (WRDM)

Files in This Item:
File Description SizeFormat 
G29363.pdf1.34 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.