Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/15012
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKhandelwal, Lav Kumar-
dc.date.accessioned2021-08-09T15:14:58Z-
dc.date.available2021-08-09T15:14:58Z-
dc.date.issued2015-05-
dc.identifier.urihttp://localhost:8081/xmlui/handle/123456789/15012-
dc.guidePadhy, N.P.-
dc.description.abstractIndia has a big network of transmission lines. These are divided in 5 grids Northern, Eastern, Western, North-Eastern and Southern Grid. Transmission is done under 765kV, 400kV and 220kV mostly. In this report we are simulating India's largest Northern Grid. It covers 9 states Delhi. Haryana, Ilimaclial Pradesh, Jammu & Kashmir, Punjab, Rajasthan, Uttar Pradesh Uttarakhand. Indian grid recently got a black out due to failure of northern and eastern grid on 30 and 31 July 2012. Reasons of black out was due to overload at buses. A simulation is required before installing a single another transmission line or voltage regulators, transformers, reactors or any other equipment in the grid or change in the load to avoid money wastage and great hazards like black out or other failures. There is real time simulation is required for closed loop testing of any physical network like grids. It allows a user - to investigate and early detect all disturbances on power system equipment and networks to prevent outages or complete failure. For this purpose we are using RTDS (real time digital simulator) with user interface software RSCAD to simulate Northern Grid. As a part of the results we are analyzing different cases based upon the load increment, L-G, LL-G, LLL-G faults at the different locations and also we are trying to simulate at minimum time step for more real time simulation. In this we are modeling three phase system consisting of 246 (220kV and 400kV )Buses, 60 Generators, 34 'l'ransformers , 30 Reactors, 204 PQ buses, 41 PV buses and 374 Transmission line and hence simulating them to understand both the steady state and dynamic behavior of the system. Data used is collected from the Internet. Due to the limitations of load handling (480units) to the processors of RTDS and no. of racks we have simulated at 400kV system by reducing this system.en_US
dc.description.sponsorshipINDIAN INSTITUTE OF TECHNOLOGY ROORKEEen_US
dc.language.isoen.en_US
dc.publisherIIT ROORKEEen_US
dc.subjectTransmission Linesen_US
dc.subjectSoftware RSCADen_US
dc.subjectTransformersen_US
dc.subjectReal Time Digital Simulatoren_US
dc.titleSIMULATION OF 400KV NORTHERN GRID NETWORK USING RTDSen_US
dc.typeOtheren_US
dc.accession.numberG24691en_US
Appears in Collections:MASTERS' THESES (Electrical Engg)

Files in This Item:
File Description SizeFormat 
G24691.pdf5.72 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.