Please use this identifier to cite or link to this item:
http://localhost:8081/jspui/handle/123456789/12322
Title: | PERT/CPM : AN APPLICATION (PRODUCTION SYSTEM PLANNING) |
Authors: | Kumar, Indra |
Keywords: | ELECTRICAL ENGINEERING;PERT/CPM;PRODUCTION SYSTEM PLANNING;INDUCTION MOTOR |
Issue Date: | 1975 |
Abstract: | The rclevencc oy a systems approach to procuction m-,na6ement is pointed out. :tn int= Er tpd systems appi,oach to1. pruction planning of a manuiuctu: ing organisation has been ci_cuL cd. 1getwork technic~ucs as a tool in system analysis has c en mentionec an the CPIVI nctwol:k h.s ceen Liscucsea i_n c eta, il. A case study oz he manus ctui e ano testing of 4 11 ' Induction Motor (Cage Type) has u, en presented. The activities invo.vea in the manu. actur'c anc testing have bc,,en i ist d ,,ith t ,c=ir L, uc at i;on anc a netti ,rk di wn based on their in` V i'Lel~tionstiips. Collputer'ise0 calculations lot' Earliest ;:;tart `.'true, Earliest Finish Time, Latest ;tart Time, Latest Finish Time LnL Total host h s been mace. The Critical activities have c-en listec ano the reairan~ements oh the results has ben cone in cl.lerent occ.er. 'he mater ial sc ~.~c 3 i« anc levelling of the reyu.ircrmc:nt s Di icat icon shop, s rely slop R,nc Mac,ii.ne s'3C)p has DCen Lore. |
URI: | http://hdl.handle.net/123456789/12322 |
Other Identifiers: | M.Tech |
Research Supervisor/ Guide: | Chandra, Ravish |
metadata.dc.type: | M.Tech Dessertation |
Appears in Collections: | MASTERS' THESES (Electrical Engg) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
EED108513.pdf | 9.58 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.