Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/12322
Title: PERT/CPM : AN APPLICATION (PRODUCTION SYSTEM PLANNING)
Authors: Kumar, Indra
Keywords: ELECTRICAL ENGINEERING;PERT/CPM;PRODUCTION SYSTEM PLANNING;INDUCTION MOTOR
Issue Date: 1975
Abstract: The rclevencc oy a systems approach to procuction m-,na6ement is pointed out. :tn int= Er tpd systems appi,oach to1. pruction planning of a manuiuctu: ing organisation has been ci_cuL cd. 1getwork technic~ucs as a tool in system analysis has c en mentionec an the CPIVI nctwol:k h.s ceen Liscucsea i_n c eta, il. A case study oz he manus ctui e ano testing of 4 11 ' Induction Motor (Cage Type) has u, en presented. The activities invo.vea in the manu. actur'c anc testing have bc,,en i ist d ,,ith t ,c=ir L, uc at i;on anc a netti ,rk di wn based on their in` V i'Lel~tionstiips. Collputer'ise0 calculations lot' Earliest ;:;tart `.'true, Earliest Finish Time, Latest ;tart Time, Latest Finish Time LnL Total host h s been mace. The Critical activities have c-en listec ano the reairan~ements oh the results has ben cone in cl.lerent occ.er. 'he mater ial sc ~.~c 3 i« anc levelling of the reyu.ircrmc:nt s Di icat icon shop, s rely slop R,nc Mac,ii.ne s'3C)p has DCen Lore.
URI: http://hdl.handle.net/123456789/12322
Other Identifiers: M.Tech
Research Supervisor/ Guide: Chandra, Ravish
metadata.dc.type: M.Tech Dessertation
Appears in Collections:MASTERS' THESES (Electrical Engg)

Files in This Item:
File Description SizeFormat 
EED108513.pdf9.58 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.