Please use this identifier to cite or link to this item: http://localhost:8081/xmlui/handle/123456789/11140
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShakya, Mahendra Kumar-
dc.date.accessioned2014-11-26T04:55:29Z-
dc.date.available2014-11-26T04:55:29Z-
dc.date.issued2004-
dc.identifierM.Techen_US
dc.identifier.urihttp://hdl.handle.net/123456789/11140-
dc.guideJain, P. K.-
dc.description.abstractIn the area of real time scheduling some work had been carried out but preventive maintenance schedule of machines, which is very important in any manufacturing system was not considered in any work. This present work provides a real time scheduling methodology including preventive maintenance schedule of machines, which is prepared in advance. An algorithm Re-Set Algorithm (RSA) has been developed. The system which is considered in this work is modeled by using Stochastic Petri Net (SPN). In the modeling five status of machine namely available, loaded, under preventive maintenance action, occupied and, failed status are considered. To simulate the Petri Net model a simulator in C++ language has been developed. The results obtained by RSA are better than the results obtained by a dispatching rule for mean flow time and makespan.en_US
dc.language.isoenen_US
dc.subjectMECHANICAL INDUSTRIAL ENGINEERINGen_US
dc.subjectREAL TIME SCHEDULINGen_US
dc.subjectPREVENTIVE MAINTENANCE SCHEDULESen_US
dc.subjectMACHINESen_US
dc.titleREAL TIME SCHEDULING CONSIDERING PREVENTIVE MAINTENANCE SCHEDULES OF MACHINESen_US
dc.typeM.Tech Dessertationen_US
dc.accession.numberG11724en_US
Appears in Collections:MASTERS' THESES (MIED)

Files in This Item:
File Description SizeFormat 
MIEDG11724.pdf2.76 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.