Please use this identifier to cite or link to this item:
                
    
    http://localhost:8081/jspui/handle/123456789/10710| Title: | A STRUCTURED ANALYSIS OF MATERIAL REQUIREMENTS PLANNING SYSTEMS UNDER COMBINED DEMAND AND SUPPLY UNCERTAINTY | 
| Authors: | Joshi, Sameer | 
| Keywords: | MECHANICAL INDUSTRIAL ENGINEERING;MATERIAL REQUIREMENTS PLANNING SYSTEMS;COMBINED DEMAND AND SUPPLY UNCERTAINTY;INVENTORY INVESTMENT | 
| Issue Date: | 2000 | 
| Abstract: | Material Requirements Planning system has achieved great significance in recent times MIRP, can substantially reduce product costs and Inventory investments while improving customer delivery performance. The performance of an - MitP system is greatly affected by uncertainty. In the present work the effect of presence of demand and supply uncertainties on material requirements planning systems are investigated. A simulation model is employed to evaluate the influence of these combined uncertainties. Their interaction with product structure variables and lot sizing techniques is also explored. | 
| URI: | http://hdl.handle.net/123456789/10710 | 
| Other Identifiers: | M.Tech | 
| Research Supervisor/ Guide: | Khare, M. K. Kumar, Dinesh  | 
| metadata.dc.type: | M.Tech Dessertation | 
| Appears in Collections: | MASTERS' THESES  (MIED) | 
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| MIEDG10153.pdf | 1.82 MB | Adobe PDF | View/Open | 
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
