Please use this identifier to cite or link to this item:
http://localhost:8081/xmlui/handle/123456789/10382
Title: | OPTIMAL POLICY FOR PREVENTIVE MAINTENANCE SCHEDULING OF THERMAL POWER PLANT USING FUZZY LOGIC |
Authors: | Zulkarnain, Haris |
Keywords: | FUZZY LOGIC;THERMAL POWER PLANT;PREVENTIVE MAINTENANCE SCHEDULING;WATER RESOURCES DEVELOPMENT AND MANAGEMENT |
Issue Date: | 2000 |
Abstract: | Thermal power plant may be base load or peaking power plants. It is necessary to meet the load demand at each and every interval, independent of type of power plant. Any loss of load due to break down of any or all the unit of plant do not only result in loss of revenue but also may resulting in threat to security of the system. Hence an optimal of preventive maintenance policy is proposed so that break down and loss of load can be minimised. |
URI: | http://hdl.handle.net/123456789/10382 |
Other Identifiers: | M.Tech |
Research Supervisor/ Guide: | Padhy, N. P. Das, Devadutta |
metadata.dc.type: | M.Tech Dessertation |
Appears in Collections: | MASTERS' THESES (WRDM) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WRDMG10456.pdf | 3.4 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.